GCP Infrastructure NAV slips again

GCP Infrastructure’s interim figures for the six months ended 31 March 2025 show a fall in NAV of 5.3p. This was driven largely by a reassessment of the long-term availability of its anaerobic digestion portfolio (biomethane to grid anaerobic digestion projects and a waste wood power station), which took off 2.87p, and lower than forecast … Continue reading GCP Infrastructure NAV slips again