GCP has lent £14.5m to finance the construction of a 10.3 MWe wood fuelled biomass power plant in Tynsley, Birmingham. The 17 year loan will yield 9.1% pa.
GCP has lent £14.5m to finance the construction of a 10.3 MWe wood fuelled biomass power plant in Tynsley, Birmingham. The 17 year loan will yield 9.1% pa.