News
- Home
- Mining News
- Ariana Resources completes Tavsan scoping study, pre-tax IRR 80%
Ariana Resources Plc (AAU:AIM)
The completion of a scoping study for the Tavsan Project in Turkey reveals excellent results. Tavsan is part of the Red Rabbit JV with Proccea Construction Co. and will be 50% owned by Ariana once mine construction at the Kiziltepe Sector is completed in Q4 2016. The Tavsan project is planned to be a satellite operation to the established Kiziltepe project which will absorb the majority of the company’s corporate overheads.
Dr. Kerim Sener, Managing Director, commented: “This is an excellent result which reinforces our view that the Tavsan Sector will become a valuable additional source of revenue within the context of the Red Rabbit Joint Venture with Proccea Construction Co. The addition of Tavsan to our mining schedule will enable the Company the opportunity to increase production from approximately 20,000 oz pa to 50,000 oz pa between two operations”.
Tavsan scoping study highlights:
On going work program for Tavsan will consist of drilling and further metallurgical test-work.
Processing to include silver along with the gold recovered which exceeds economic cut-off. The silver contained with the mineralisation adds credits as an output but is not economic on its own. Of approximately 136k oz of gold input to the heap leach, approximately 109k oz Au is recovered at an 80% recovery rate using an approximated cut-off grade of 0.96 g/t Au, for the base case gold price of US$1060/oz.
Please review our cookie, privacy & data protection and terms and conditions policies and, if you accept, please select your place of residence and whether you are a private or professional investor.
Due to data protection policies, USA residents can not access our data.
Your content has been curated